
Economic-cybernetics is basic-knowledge
This page 3 will show You
how to built up a BIOSYSTEM3000.
(Probably the second year) structure plan level 2
conditions is the completion of the target according to contract for work of step 1.
Beginning with the concrete local choice, geophysical bases for the Terraforming, test drillings, map production, architecture, measurement, communication
Team approx. 30 Persons, 10 Persons in Berlin, 20 until 30 Persons on site.
Working time 1 until 2 years
Personnel Costs and Organization approx. 10 Million EUROS pro anno
Following Crafts is established in this level:
Catering
Chemistry laboratory
Service for Analysis
Service for Documentation und Logistics
Mass Media Service
Start Motor Vehicle Workshop
Start Air Conditioning Engineering
Start Water Engineering
Start Storage Management and Logistics
Material Investments for Facility Costs and Device approx. 10 Million Euros on site.
(Probably the third year) structure plan level 3
This construction work take place time-moved to level 2. The team of the level 1 moves to the base camp on site. This step serves the protection of the self-supply of all participants and all working assistants
Team approx. 150 Persons, 30 Persons in Berlin, 120 Persons on site.
Personnel Costs and Organization approx. 20 Million EUROS pro anno (part subsidized)
Working time unlimited.
Material Investments for Facility Costs and Device approx. additional 40 Million Euros on site.
Waste Water Recycling
Bakery
Carpentry
Container Construction (Glass Reinforced Plastic)
Mining
Rescue Service
Concrete Work
Soil Processing
Small Brewery
Catering and Supply Logistics
Extension of the chemistry laboratory
Roof Construction
Data Register and EDV-Programmes
Extension of Service for Analysis
Extension of Service for Documentation
Elektronic Laboratory
Window and Door Construction
Butcher´s Shop
Generator Construction
Glass Reinforced Plastic and Pagholz (special wood mixed with artificial resin)
Glass Blowing
First Extension Level of Large Kitchen
Civil Engineering (Building)
First Extension of Isolation Material
Air Conditioning (Freezing Technic)
Winepress
Motor Vehicle Workshop
Extension Level Air Conditioning
Air Conditioning (Cool Technic)
First Extension Level of Storage Management
Mass Media Service
Furniture Construction
Molecule Sieve
Recycling
Sawmill
Slate Workshop
Butcher´s Shop
Tailoring
Broadcast and Recive Station
Civil Engineering (Road Construction)
Pottery
Transport Management and Logistics
Ventilators Construction
Water Engineering
Brickfield
Special Logistics for Tourism
(Probably the forth year) structure plan level 4
Condition is the completion of the target according to contract for work of all preceding levels the indented levels/crafts come additionally new and the remaining ones are industrially extended, adequate to the supply system and the worldwide demand.
Material investments for facility costs and device are approx. 70 to 80 million euros on site. Personnel costs for 300 persons is not exactly to be estimated, because they are dependent on the political situation, the subsidies and on the interconnection with the local population.
Approx. 6 to 12 million euros per year.
At the same time the persons of the level 3 free for consultation services with which they would have to be financed only approx. 10% from the running project. These would be only 2 million euros per year (partial subsidized)
Material investments for facility costs and device approx. other 40 million euros on site.
Abaca Spinning Mill*)
Joinery Carpentry
Extension Container Construction (Glass Reinforced Plastic)
Extension Surface Mining
Extension Soil Processing
Boat Construction*)
Bronze Casting
Extension Catering and Supply Logistics
Cellulose Laboratory and Biologic substance Production
Roof Construction for Mass Production (Green-Houses)
Lathe Workshop*)
Electric Motor Construction*)
Elektronic Laboratory
Anodizing Work (electric oxidation of aluminum)*)
Window and Door Construction
Fish Farming industrial Production*)
Butcher´s Shop
Foils and Glass Reinforced Plastic*)
Shape Construction*)
Forestry*)
Generator Construction
Glass Reinforced Plastic and Pagholz (special wood mixed with artificial resin)
Glass Blowing
Large Kitchen industrial Production*)
Rubber and Vulcanization*)
Extension Isolation Materials
Freezing Engineering
Canal and Lock Construction*)
Gravel Management industrial Production*)
Tinned Foods Production
Air Conditioning (Cool Technic) industrial Production
Plastic Processing*)
Extension Storage Management
Metal Construction*)
Metal Cast industrial Production*)
Raschel (by machine crocheted)-Weaving Mill industrial Production*)
Pipes industrial Production*)
Tubes industrial Production
Screen Work industrial
Quarry industrial
Surface Mining industrial
Teflon Coating*)
Pond Management industrial
Civil Engineering (Road Construction) industrial
Pottery industrial
Ventilator Construction industrial
Galvanizing industrial
Water Engineering industrial
Weaving Mill industrial
Brick Field industrial
*) = new coming crafts at this level
The others expands further on to industrial size.
The difference between the estimated start investment of the total investment volume of the Biosystem3000 at the rate of 225 million euros and the personnel costs incl. organization 45 million until level 4 and the material investments 90 million until level 4 for facility costs and device make a free space of approx. 100 million which can be more exactly calculated, however, only after level2.
With a yield of the selffinancing from 5 years can be calculated on yearly decreasing personnel costs from the start investment.
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
EXACT CALCULATIONS and FORECAST
The Recultivation speed and therefore the yield gain are depending on land formation, the climate conditions based on the regional recorded average values of the last 5 years.
Other dependence result from the being ready quantity of water, the well situation, the sewage situation and the generateable precipitation to the start filling of the water tanks.
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
(Probably the fifth year) structure plan level 5
Parallel to level 3 starting Terraforming processes create streets, ways, ponds and canals. The greenhouse forming is a water recovering closed system as it is already used in Spanish research attempts. It is necessary to prevent climatic disturbances. Protein coagulates from 40 degrees centigrade.
The surface temperatures in steppes and deserts are mostly in longer periods by far higher and at night often under ZERO degree centigrade. So such a Green-House development is indispensable and also an existential basic condition. The foundations form on site available stone occurence. The climate control is a special subject which helps to convert the warm recovery with warm pumps into energy.
After the preliminary works results the recultivation in protected greenhouse structure. The agricultural means of production serve with priority the green mass production to regenerate the soil quality. The attempts of using Cellulose for the water storage in the desert are unrealistic because the industrial process for the production of this valuable raw material stands in no relation to the required amount. This counts either for the cost side or for quantity proportions.
The Recultivation Process results according the rule of ENERGY-GENETICS.
The first step is the area recultivation of capsuled seeds which can be rooted on desert soil. Parallel additionally seed cultivation and cutting reproduction is pursued.
After 3 to 4 years the roofs of the greenhouses can be put gradually, as far as the protective plantations of the Perma culture are stabilized. Whether this lasts 1 or 2 years longer, depends on computable factors which are examined on site in level 1.
The cost situation decides on the deployment of the manpower.
This is also a subsidy-conditioned.
Approx. 30% of the land surface is used for the cultivation of useful plants for the food supply of the population living on site. The system is used according HOLZER.
During these 5 years the adviser's structure is thined out constantly until the project only with local manpower is pursued. Thereby sinks the personnel costs factor of the subsidized start phase. It is planned to carry out a capital reinvestment in this time in arrangement and planning with the investors to take advantage of both the changed capital markets and the production means development regarding to the yield.
The outlet is immensely big and gainful, because the old civilisation destroys her agriculture and creates economic deserts and agricultural steppes.
Answers to FAQ regarding the Yield:
1.
Even without exactly precalculation an extremely high economic yield in the plant production and animal production is academically predictable and provable: By our research on the subject ENERGY GENETICS we are able to raise sheet and fruit from 100% to 300%, without artificial fertilizer and without plant chemistry and also the stress firmness. The energetics works positively on all creatures: Animals, people and plants.
2.
Permaculture has in contrast to an usual MONO CULTURE or MIXING CULTURE a yield of 100 kcal of input to 200 kcal of OUTPUT. These are 100% of improvement in a growth period. Monoculture is however a bankruptcy system of 300 kcal of input to 1 kcal of OUTPUT, besides, water destructive and climate negatively changed. This is a knowledge of 1930 and approved research bases. Especially problematic is monoculture and irrigation cause soil emaciation. We can repair this damage.
3.
A greenhouse system of steel and glass are well known as a yield projects which are worldwide running. So needs the yield of a greenhouse not specially to be proved which is however built too much lower investment costs, and also is additionally autonomous in his energy supply.
4.
Only 3% of the water available on the earth is suitable for the human use. Sea waters and sewage are 97%. The Biosystem3000 has all available knowledge to the water production. The Biosystem3000 is able to generate and to win water by different processes in contrast to all other settlement economic systems and agriculture systems. The old form of the civilisation on the other hand destroys water.
5.
All crafts involved in a Biosystem3000 are usual production enterprises and service enterprises. These enterprises are profitably active worldwide since generations. The profitability calculation of all single involved enterprises is simple and possible by the traditional business management. Because it concerns new establishments, the success is dependent essentially on the knowledge and deployment of the management.
These conditions are at a high quality level presentable. Success factors for a high yield are however according the design of investment substance of marketing plan and sales plan and the personell costs. Marketing, sales and personnel costs are matchless low in the desert region. The investment volume can be held low by surplus of offer on the market.
6.
An additional yield can be done from exports and tourism, because this project attracts attention.
7.
We explain about the additional possibilities from the expansionary capital yield only after contract acceptance in the internal circle of the involved partners. The capital yields lie approx. over 100% according the proved rules of capital market.
FAQ to the Water Rights:
The central quotation to water:
"Profit-Radar" by Volkmar Michler and Daniel Wilhelmi INVESTOR VERLAG (INVESTOR PUBLISHER) Sept.2007
A gallon crude oil costs 1.45 $. A gallon Evian costs 11.91 $. This simple observation brought a successful investor to the assertion, oil would be undervalued. Water is nowadays approx. 10 x as expensive as crude oil!!! (Sept. 2007)
Our statement (written by MiNo):
Big investors buy nowadays many rights on water use. Those rights will produce no new or more water. It is a deadly mistake and a way in the bankruptcy. The most rights on water use are worthless if the regional climate the deep wells leaves to dry up. This already happens in the northern USA in the Great Planes and in Utah. Also areas in Spain and in Greece are already concerned.
The water situation under the headword:
" The subject Climate change will be in future a daily subject - also for investors ", is treated in the following article. The central quotation on the subject Water: "profit radar" by Volkmar Michler and Daniel Wilhelmi INVESTOR PUBLISHER OF SEPT.2007 We dispatch the entire article with pleasure by e-mail you find the link also on our Internet page: schautafel.de
Click here for the page 2 please 2-engl-built-a-biosystem.html
You will find other explanation under:
WHAT is a BIOSYSTEM?
http://groups.google.com/group/biosystem-managers/web/what-is-a-biosystem3000.
http://groups.google.com/group/biosystem-managers/web/what-is-a-biosystem3000
Marketing Basic German
Click on http://groups.google.com/group/biosystem-managers/web/manager-bentigen-erfolgs-grundlagen?hl=de.
If it does not work, copy the link and paste into the ledge of your browsers.
Marketing Basic English
Click on http://groups.google.com/group/biosystem-managers/web/success-needs-basics-of-knowledge.
http://groups.google.com/group/biosystem-managers/web/success-needs-basics-of-knowledge
If it does not work, copy the link and paste into the ledge of your browsers.
CURRENT DISCUSSIONS-TOPIC
Click on http://groups.google.com/group/biosystem-managers/web/biosys.
http://groups.google.com/group/biosystem-managers/web/biosys
If it does not work, copy the link and paste into the ledge of your browsers.

Profits are to be realized only from REAL net value.
Net value added has cybernetic basics and is only the result of the MATERIAL REALITY.
Theoretical net values are NO REAL NET VALUES.
The so-called "PRODUCTS of the finance-economy" are NO REAL MATERIAL REALITY!
We, OUR BIOSYSTEM-TEAM, create real values, raw materials, water, energy and jobs.
We collect Managers for our network because we know how to generate
a new system for life and civilization.
We don't steal, we organize without predatory and without covered myself-fraudulent exploitation.
We are the managers of the Biosystem3000.
We look for partners and consultant- clients, knowing these connections and wanting to attain our knowledge.
Therefore we seek MANAGERS world-wide.
Become our Partner !
Dr. Licita Geppert
Postfach 4
10121 Berlin
Tel: +49 (0)30 250 15 205
www.biosystem3000.de
Questions directly to :
shaumbralicita@gmx.com
quantumessence@kabelmail.de
All Links :
http://groups.google.com/group/megatrend737/web/alle-links-zum-biosystem---deutsch-u-englisch?hl=de
English
textes are red !